The Site Management module keeps you on top of day-to-day construction
activities. You can instantly monitor productivity of company and subcontracted
labor. Document everything that happens on projects including weather,
material delivered, equipment used and labor expended. You can also manage
such critical aspects as safety programs, quality control programs, equipment
testing, inspections and the overall punch list.
| Feature |
|
Advantage |
|
| |
|
|
| Daily Details |
|
Provide an accurate record of the daily temperature
and weather that may prove important in determining project claims. |
| |
|
|
| Daily Work Journal |
|
Ensure your projects are not delayed by a labor shortage
by monitoring productivity. |
| |
|
|
| Events |
|
Maintain a running total of materials installed and
actions taken, such as concrete poured, earth excavated, etc. |
| |
|
|
| Field Work Directives |
|
Use field work directives to start tracking unforeseen
conditions and scope changes on the project. |
| |
|
|
| Inspections & Tests |
|
Keep everyone informed about the progress of the project
from an inspection perspective and develop early trust in testing
equipment. |
| |
|
|
Material
Inventory
|
|
Document material delays, an important part of the project
history. |
| |
|
|
| Notice to Comply |
|
Provide a documented quality control program that ensures
material is being installed correctly. |
| |
|
|
| Punch Lists |
|
Break down long punch lists into smaller, more manageable
lists, parsing by location, subcontractor, outstanding items, etc. |
| |
|
|
| Safety Notices |
|
Keep accidents to a minimum, and help minimize insurance
costs by enforcing and documenting a safety program. |
| |
|
|
|
|